customer  Besix (RWS)
country  The Netherlands
location  Born, Maasbracht, Heel
period  2007 - 2011
projectamount  € 150.000.000

Extension of 3 locks in Limburg, The Netherlands

 

Lievense is commissioned by Besix to participate in a Design & Construct project for the extension of 3 locks in the river ‘Maas’. The locks in Born, Maasbracht and Heel have a fall of 6 to 12m and need to be extended and renovated to be able to lock ships up to CEMT Vb. For the tender design Lievense is responsible for the integration of all design activities; civil works, mechanical works and electrical/ installation works. The civil work design, including the lock extension, new lock entrances and upgrading of existing lock walls, is carried out by Lievense.

 

Activities:

D&C tender design:

  • lock extension
  • new lock gates
  • renovation exixting locks
  • system engineering